Areas to be benefitted- Mothrowala ( Ward no. 85-34%)
in Dehradun
Population: 8369
HSCs : 1636 Nos
Proposed works in water supply project:
1 no. of Tube Well at Nai Basti |
1 no. of Pump House |
1 No. of Over Head Tank |
SCADA based control system |
Sewer Network Length: 15.94 Km
Water Supply Network Length: 27.07 Km
Storm Network Drainage Length: 7.67 Km
STP: Proposed at Indrapuri Farm 11 MLD Capacity.
Design year- 2051